This hallway floor tiling in Mapperley Top, Nottingham was our last job in March before the very first national lockdown, Alex and his wife are a very lovely couple they had major issues from a previous tiler who tiled the job 6 months beforehand, the preparation work wasn't carried out correctly beforehand so the floor itself had failed due to poor preparation causing massive cracks spilt through the tiles and they started to pop.
Alex loved the tiles so much that they wanted the same ones going back down so all the tiles came up and we primed the floors first with a sbr primer then primer gripped the floors then we self leveled it all through and then used a ditra fracture matting with a s2 adhesive. Unfortunately we could not lay the tiles until May due to the national lockdown, but we finished the job as soon as we able too. Call us for more information and a free quotation for all our tiling services!
0 Comments
Leave a Reply. |
AuthorTale a look at the recent work carried out by Youngs Tiling. Archives
March 2020
Categories
All
|